Summary
- Was originally a 3 phase project but was reduced to a 2 phase project
- Replacement of curb and cutter, sidewalks
- Replacement of Roadway
- Deep / Large Diameter Sanitary Sewer
- Very Tight Timelines
- High profile location / Very commercialized / coordinating with various business’
- Temp Watermain was used to supply water to business’
- Contaminated Material Trucked Out
- Very High Water table
- Extensive Traffic Control Plan due to closed road
Quantities Summary
Sanitary Sewer: 200mm – 525mm 571 lm
Sanitary Manholes: 11
Storm Sewer: 375mm diameter 59 lm
Storm Manholes: 6
Catchbasins: 8